Checklist for Inspection of Training Institutes/ Centers/ Schools in Zonal Railways : Railway Board Order dated 05.12.2025

Checklist for Inspection of Training Institutes/ Centers/ Schools in Zonal Railways : Railway Board Order dated 05.12.2025

Checklist for Inspection of Training Institutes/ Centers/ Schools in Zonal Railways : Railway Board Order dated 05.12.2025

भारत सरकार (GOVERNMENT OF INDIA)
रेलवे बोर्ड (MINISTRY OF RAILWAYS)
रेलवे बोर्ड (RAILWAY BOARD)

NOC 2023/CE-II/TK/Inspection

New Delhi, Date 05.12.2025

Principal Chief Engineers,
All Zonal Railways.

Sub: Inspection of Training Institutes/ Centers/ Schools in Zonal Railways.

Ref: RB’s letter No. 2007/EDCE(P)/Insp. Note dated 07.06.2016

Zonal Railways vide this office letter under reference were advised that the Training Institutes under their jurisdiction shall be inspected by CTEs and CE(G)s at least once in six months.

In continuation to the above, a checklist for inspection of Training Institutes/Centers/Schools is enclosed. Zonal Railways are requested to inspect all the items included in the checklist. The checklist is indicative and not exhaustive.

This issues with the approval of the competent authority.

DA: As above.

(Saurabh Jain)
Director, Civil Engg. (Plg.)
Railway Board

Checklist for inspection of Training Institute/Center/School

SNInspection AreaCheck list ItemYesNoRemarks
1InfrastructureBuildings and classrooms are in good condition and well maintained
2Premises including toilets areas are clean
3Adequate furniture (tables, chairs, desks, podium) is available
4Rooms have proper lighting and ventilation
5Safe and adequate drinking water supply is provided
6Toilets and washrooms are sufficient and segregated by gender
7Fire extinguishers, emergency exits and safety signage are in place
8First aid kit and access to medical services are available
9Hostel accommodation are sufficient for training batches
10Hostel facilities are clean and safe
11Messing facilities is available or not
12Kitchen and canteen facilities are hygienic and clean (if available)
13Teaching FacilityUninterrupted power supply and backup are available
14Classrooms are sufficient for training batches
15Functional whiteboards
16Updated codes and manuals available
17Availability of course wise study material
18Audio visual teaching facility
19Model rooms are properly equipped
20Availability of demonstration yard
21Library stocked with relevant materials and reading space
22Computer labs and internet access available
23Qualified and sufficient teaching staff present
24Timetables and attendance records properly maintained
25Safety instructions visibly displayed and used
26Other FacilitiesRecreational and sports facilities are available
27Notice boards and information displays are up to date
28Feedback and grievance redressal mechanism in place
29Adequate security measures (guards, CCTV) implemented
30Housekeeping and maintenance services

****

भारत सरकार (GOVERNMENT OF INDIA)
रेलवे बोर्ड (MINISTRY OF RAILWAYS)
रेलवे बोर्ड (RAILWAY BOARD)

N. 2007/EDCE(P)/Insp. Note

New Delhi, Dt. 07.06.2016

Principal Chief Engineer
Ali Zonal Railways

Chief Track Engineer
Ali Zonal Railways

Chief Engineer(General)
Ali Zonal Railways

Sub: Inspection of Centralized Training Institute

Additional Member/Civil Engg., Railway Board has directed that Training Institute on Zonal Railways shall be inspected by CTEs and CE(G)s at least once in six months.

The compliance of the above stated direction may please be adhered to. Inspection report may also be furnished to Board’s office for information.

(Pankaj Tyagi)
Director Civil Engg.(P)
Railway Board

Click to view/download PDF

Follow us on Telegram ChannelTwitter and Facebook for all the latest updates

COMMENTS